Lots of progress on the back bedroom -- it's getting close enough to done to see the end of the road.

Still Here

Sep. 3rd, 2011 12:06 am
balzacq: (Default)
Right. The earth did not open up and swallow us whole along with our house.

The back bedroom project is still underway, though. After gutting it back in March and April, we pretty much ran out of time and money. In May I was able to get all the framing done: I filled in the existing exterior door, framed two windows, added a real closet, and created a rough door opening where the end of the hallway once was. In June or thereabouts I was able to buy a roll of wire and run the almost all the electrical. And there I stopped for a couple of months.

Originally published at Casa de Lovely
» Click here « to leave any comments.

balzacq: (Default)
Last weekend I started on the back bedroom/hallway project. The plan is:

• Gut down to the studs
• Frame in the door to the outside
• Add a window to that wall
• Take out the existing closet wall and move the doorway back to the bathroom wall
• Add a real closet and a reading nook
• Rewire properly
• Add attic stairs to the hallway ceiling
• Lay down a plywood floor in the attic for storage
• New drywall and moldings


Originally published at Read more at Casa de Lovely
» Click here « to leave any comments.

balzacq: (Default)
Since my last post I've gotten a bunch of smallish projects done, and I'll address those before going into the stairs project and the painting project:
(Plumbing and Electrical!)

Originally published at Casa de Lovely
» Click here « to leave any comments.

balzacq: (Default)
We're finally able to go ahead with upgrading the electrical service from 125 amp (and a totally-full, out-of-date, not-terribly-safe panel) to a nice shiny new 200 amp Siemens panel.

The plan is to install a new mast and meter in a better location on the house (where the wires won't cross over the roof at no more than five feet clearance), run conduit back to the same room in the basement as the old panel, install the new panel there, put in a 100-amp breaker and run a feeder cable to the old panel. That way I can leave the horrible mess of electrical spaghetti untouched for now, and as I remodel rooms put new circuits in the new panel and retire circuits from the old panel until I can remove the old panel completely.

Originally published at Casa de Lovely
» Click here « to leave any comments.

balzacq: (Default)
The treehouse is down. Went up on the ladder with the sawzall a couple of weekends ago and made pretty short work of it, considering that it was fairly sturdily built -- except of course it was built of non-treated lumber so the roof was bowed in and the 2x4s were soaking wet. It's really amazing how big the pile of junk lumber is from such a small building.

Originally published at Casa de Lovely
» Click here « to leave any comments.

January 2015

S M T W T F S
    123
45678 910
11121314151617
18192021222324
25262728293031

Syndicate

RSS Atom

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Jul. 6th, 2025 09:56 pm
Powered by Dreamwidth Studios