Electrical Upgrade Preparations
Jun. 25th, 2010 10:09 amWe're finally able to go ahead with upgrading the electrical service from 125 amp (and a totally-full, out-of-date, not-terribly-safe panel) to a nice shiny new 200 amp Siemens panel.
The plan is to install a new mast and meter in a better location on the house (where the wires won't cross over the roof at no more than five feet clearance), run conduit back to the same room in the basement as the old panel, install the new panel there, put in a 100-amp breaker and run a feeder cable to the old panel. That way I can leave the horrible mess of electrical spaghetti untouched for now, and as I remodel rooms put new circuits in the new panel and retire circuits from the old panel until I can remove the old panel completely.
The plan is to install a new mast and meter in a better location on the house (where the wires won't cross over the roof at no more than five feet clearance), run conduit back to the same room in the basement as the old panel, install the new panel there, put in a 100-amp breaker and run a feeder cable to the old panel. That way I can leave the horrible mess of electrical spaghetti untouched for now, and as I remodel rooms put new circuits in the new panel and retire circuits from the old panel until I can remove the old panel completely.
Originally published at Casa de Lovely » Click here « to leave any comments. |